OSHA Lead in Construction Advisor
What are control practice requirements associated with
OSHA's Lead in Construction Standard?
(Table summarizes
control practices by exposure level.)
Standard |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Control practice | Exposure below 30 ug/m(3) AL | Exposure >= 30 and < = 50 | Exposure above 50 ug/m(3) PEL | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Footnote(a) | Exemption is possible if objective data show that exposures are below the action level or if the employer has relevant data from the past 12 months. |
Footnote(b) | Enclosures are assumed only to be needed in conjunction with indoor projects using mechanical ventilation. Outdoor enclosures are required by EPA regulations concerning environmental release of lead. |
Footnote(c) | The Lead Standard requires the employer to provide a training program for all employees exposed at or above the action level or who may suffer skin or eye irritation from lead compounds such as lead arsenate or lead azide. |
Footnote(d) | Hand-washing facilities for activities below the PEL are required by 29 CFR 1926.51(f). |
Footnote(e) | Medical removal is dependent on worker blood lead level. |
Source: OSHA |